Compute Topology

AI infrastructure on powered land, planned around the power on each site and held in one SPV for each project.

Powered Land First

Every project starts with a site where the power is already connected and the land is agreed with its owner. Partners in our network build and run the infrastructure, avoiding lock-in to a single vendor.

Scale and Capacity

Our first project uses 0.5 MW of IT load, and later projects are planned at up to 2 MW each. At 0.5 MW of IT load, a site holds about 4 racks at about 120 kW (liquid cooled) or about 12 racks at about 40 kW (air cooled), depending on the servers. Figures are design targets and are confirmed for each project in the Phase One study.

// design_targets
"structure": "one_spv_per_project"
"first_project_it_load": "0.5_MW"
"later_projects_it_load": "up_to_2_MW"
"racks_in_0.5_MW": "4_to_12"

On This Page

Powered Land First

Scale and Capacity

REQUEST MARKET REPORT

Ask for the Phase One study before capital moves.

Structure & Legal Note. Economics & Operating Note. AI-Native Operations Note. Leadership & Team Note. Available on request.